Monday, February 27, 2012

February 2012

Sorry about missing January. what I have been working on  is completing the DVD I have so now I have 8 volumes. I will up date my list shortly.

One of the DVD I did was re-purposing a sweater. Back in 2006 when I started with the Ultimate Sweater Machine. I made a pullover. I loved the color (a real pretty green) but when I got it done. The sleeves were too long and the collar was too wide, so I did not wear it too often.

I decided back in January to re-purpose it. So I took the sweater apart (I used Redheart Yarn) and re-knitted it doing it as a cardigan. I have worn the sweater more often in the past 3 weeks than I ever did since 2006.  This is what it did look like, I will post a photo as soon as I locate it.  Now it is a cardigan with a darker green trim and a shirt type collar.


Friday, December 9, 2011

WIP for December

I have a new place for purchasing my items.    http://cds-studios.webs.com  There you will find a gallery of the Doll dresses I have available (or if  you just want to look) If you find a dress you want email me. I also have my DVD's available there. There are even some patterns available for purchase

I am getting a new camera soon so lots of new videos coming

thanks for watching and following me


Saturday, November 12, 2011

My DVD's that are for Sale

Here is a list of the DVD's I have available

Vol 1 a keyhole sweater with cap sleeves  (You can choose three (3) sizes)
Vol 2 a classic sweater with cap sleeves (You can choose three (3) sizes)
Vol 3 a raglan sweater with short sleeves (You can choose three (3) sizes)
Vol 4 Build your own mitten (ladies medium/Large)
Vol 5 in the works : dishcloths on the Bond.

Sunday, November 6, 2011

WIP in November

This month I am redoing my Volume 4, Some of the voice recording was very hard to hear, So I am redoing the necessary chapters.  In between that I am making 18 inch doll cloths for my store at shophandmade.com.

I have also been working on some hand made tools using polymer clay













Friday, October 28, 2011

Work in Progress

I am putting the final touches on Vol 4 Come Knit with me -- Mittens, it will be 25.00 this includes shipping
you will be creating various options for mitten on the Bond. here are some of the mittens. The introduction is the only part that has music. I do not play with music.

Thursday, October 6, 2011

October WIP

I am currently designing knitted shoes the ones pictured are done on a standard machine, I want to convert them for the Bond. the pattern will be available as soon as I perfect it.

I am finished with Vol 4 of Come Knit with me.  Vol 4 is creating mittens on the bond. the dvd's are 25.00 this includes shipping and handling.

So Now I have:

Vol 1 a keyhole sweater with cap sleeves
Vol 2 a classic sweater with cap sleeves
Vol 3 a raglan sweater with short sleeves
Vol 4 Build your own mitten
Vol 5 in the works : dishcloths on the Bond.

Saturday, September 24, 2011

What have I been doing

Just a short note to let you know the I am still around, I am making mittens to go on my next DVD that I am creating, I am playing with my new garter bar from KrisKrafter, which is absolutely wonderful. can't say enough about it. It make decreasing so much easier, the tines do not move on you like the hand made ones do. Believe my I have made my share of homemade garter bars. the KrisKrafer does not even compare.  I plan on a few short videos for youtube using the garter bar. So stay in touch. I will try and do the same.

The Worst

I think I am the worst blogger. I will work on that. I am currently working on a tissue box cover. I got tired of fishing out the tissues wh...