Skip to main content

October WIP

I am currently designing knitted shoes the ones pictured are done on a standard machine, I want to convert them for the Bond. the pattern will be available as soon as I perfect it.

I am finished with Vol 4 of Come Knit with me.  Vol 4 is creating mittens on the bond. the dvd's are 25.00 this includes shipping and handling.

So Now I have:

Vol 1 a keyhole sweater with cap sleeves
Vol 2 a classic sweater with cap sleeves
Vol 3 a raglan sweater with short sleeves
Vol 4 Build your own mitten
Vol 5 in the works : dishcloths on the Bond.

Comments

Popular posts from this blog

Wip for August

H, It has been a while, I have not done a lot with my machine, but I have made a tablet satchel. The instructions:
bring foward 33 stitches (FWP) put EON into NWP
cast on (EON)with a chain between each needle, (or crochet a chain of 33, and hang EON
RC 000 Knit 10 rows,
RC 010  K2tog, YO across
Place needles that were in NWP into WP
RC 046  to RC 67 follow pattern  https://www.box.com/s/xpzzp88pjyaxd0yokb33
RC 68 to 122 run life line
RC 123 to133 Knit
RC 000
RC 001 k1, *yo, k2tog repeat from * across
RC 002-010 knit, graph to row 102

create an I-cord the length of the piece of work, plus what you want for a handle

Fold the material in half vertical (placing the pattern 1/2 in the front and 1/2 in the back)
Attaching I cord to satchel
using the overcast stitch, catch the edge seam of front and back, then into 1 or 2 stitches of the I cord then back into the next stitch in the overcast fashion,  (needle will be making a circle motion)  I will post a photo soon.

Update August

I have not done a whole lot of creating. or filming for that matter, trying to adjust going from a 3 room house to  1 room in father in laws house. So it has been an adjustment, (still is) I am redoing the baby sweater with cables.